We use cookies to ensure our site functions properly and to store limited information about your usage. You may give or withdraw consent at any time. To find out more, read our privacy policy and cookie policy.
Manage Cookies
A cookie is information stored on your computer by a website you visit. Cookies often store your settings for a website, such as your preferred language or location. This allows the site to present you with information customized to fit your needs. As per the GDPR law, companies need to get your explicit approval to collect your data. Some of these cookies are ‘strictly necessary’ to provide the basic functions of the website and can not be turned off, while others if present, have the option of being turned off. Learn more about our Privacy and Cookie policies. These can be managed also from our cookie policy page.
Strictly necessary cookies(always on):
Necessary for enabling core functionality. The website cannot function properly without these cookies. This cannot be turned off. e.g. Sign in, Language
Analytics cookies:
Analytical cookies help us to analyse user behaviour, mainly to see if the users are able to find and act on things that they are looking for. They allow us to recognise and count the number of visitors and to see how visitors move around our website when they are using it. Tools used: Google Analytics
Share Rainbow Park Playground on FacebookShare Rainbow Park Playground on TwitterShare Rainbow Park Playground on LinkedinEmail Rainbow Park Playground link
The Rainbow Park playground was installed in 1995 and is one of the oldest playgrounds in the Milwaukee County Parks system. Funding was approved in the 2021 budget for the replacement of the playground. The new playground system will include ADA-accessible features, and surfacing will be upgraded to a mixture of "poured-in-place" surfacing (soft, rubberized surface) and engineered wood fiber. This is a safer and cleaner play option compared to sand (existing surfacing).
Rainbow Park has officially finished installation. The new installation included a new playground, removal of sand and the addition of wood chip medium, and corresponding site improvements, such as new benches.
Before Photo
After Photos
Playground Rendering
The playground consultant has prepared a design for the Rainbow Park playground based on the results of the initial playground survey distributed to neighbors and Friends of Rainbow Park. The preferred playground elements were incorporated into the design. See the renderings below.
The Rainbow Park playground was installed in 1995 and is one of the oldest playgrounds in the Milwaukee County Parks system. Funding was approved in the 2021 budget for the replacement of the playground. The new playground system will include ADA-accessible features, and surfacing will be upgraded to a mixture of "poured-in-place" surfacing (soft, rubberized surface) and engineered wood fiber. This is a safer and cleaner play option compared to sand (existing surfacing).
Rainbow Park has officially finished installation. The new installation included a new playground, removal of sand and the addition of wood chip medium, and corresponding site improvements, such as new benches.
Before Photo
After Photos
Playground Rendering
The playground consultant has prepared a design for the Rainbow Park playground based on the results of the initial playground survey distributed to neighbors and Friends of Rainbow Park. The preferred playground elements were incorporated into the design. See the renderings below.
Share your thoughts on the playground options by participating in the survey.
The survey itself should take less than 10 minutes to complete. Your feedback and insight will be used to help shape plans at Rainbow Park.
Thank you for taking time to contribute your voice to this project.
Share Playgrounds Survey - Rainbow Park on FacebookShare Playgrounds Survey - Rainbow Park on TwitterShare Playgrounds Survey - Rainbow Park on LinkedinEmail Playgrounds Survey - Rainbow Park link
Page last updated: 20 Sep 2023, 03:25 PM
Project Location
Signup Banner
Project Stage
Plan
Rainbow Park Playground has finished this stage
During the planning stage we complete site surveys, feasibility studies, and gather additional information to develop project goals, outcomes and budgets.
Envision
Rainbow Park Playground has finished this stage
With community input, we develop potential project solutions, identify funding sources and make budget requests.
Design
Rainbow Park Playground has finished this stage
Design of the new playground should be completed by mid-2022. The design stage can include several phases, including concepts, iterations, final design and engineering design plans. Once design is complete we develop technical renderings and construction plan documents.
Construction Ready
Rainbow Park Playground has finished this stage
During this stage requests for bids are issued and contractors are selected. Sometimes projects may wait in this stage until construction funding is secured.
Construction
Rainbow Park Playground has finished this stage
Construction is underway and will follow the construction plan - which may include several phases. During this stage facility and road closures may be needed.
Close Out
Rainbow Park Playground has finished this stage
Construction has ended and final reviews are underway
In Use
Rainbow Park Playground is currently at this stage
New playground expected in Summer to Fall of 2022, with the project planned to be open to the public for use.