We use cookies to ensure our site functions properly and to store limited information about your usage. You may give or withdraw consent at any time. To find out more, read our privacy policy and cookie policy.
Manage Cookies
A cookie is information stored on your computer by a website you visit. Cookies often store your settings for a website, such as your preferred language or location. This allows the site to present you with information customized to fit your needs. As per the GDPR law, companies need to get your explicit approval to collect your data. Some of these cookies are ‘strictly necessary’ to provide the basic functions of the website and can not be turned off, while others if present, have the option of being turned off. Learn more about our Privacy and Cookie policies. These can be managed also from our cookie policy page.
Strictly necessary cookies(always on):
Necessary for enabling core functionality. The website cannot function properly without these cookies. This cannot be turned off. e.g. Sign in, Language
Analytics cookies:
Analytical cookies help us to analyse user behaviour, mainly to see if the users are able to find and act on things that they are looking for. They allow us to recognise and count the number of visitors and to see how visitors move around our website when they are using it. Tools used: Google Analytics
Share Popuch Park Playground on FacebookShare Popuch Park Playground on TwitterShare Popuch Park Playground on LinkedinEmail Popuch Park Playground link
Popuch Park Playground is one of the oldest playgrounds in the Milwaukee County Parks system, having been installed in 1999. Based on age and condition, this playground is a high priority for playground replacement. Funding for the playground was appropriated in the 2024 adopted capital budget.
The new playground system, would include ADA-accessible features and play structures for both 2-5 and 5–12-year-old children. The playground surfacing will be upgraded from sand to a mixture of poured-in-place (PIP) rubber (soft, rubberized surface) or a combination of PIP rubber and engineered wood fiber (wood chips). These are safer and cleaner options compared to the existing surface. Additionally, the dilapidated benches along the playground’s perimeter will be replaced. The approved budget includes the design, removal of existing playground equipment, and installation of a new playground. The expected construction is Fall of 2024.
Playground Design Options Help decide which playground fun features and slides get added to the design. Take the survey below. The survey will remain open until Monday, April 8th.
Popuch Park Playground is one of the oldest playgrounds in the Milwaukee County Parks system, having been installed in 1999. Based on age and condition, this playground is a high priority for playground replacement. Funding for the playground was appropriated in the 2024 adopted capital budget.
The new playground system, would include ADA-accessible features and play structures for both 2-5 and 5–12-year-old children. The playground surfacing will be upgraded from sand to a mixture of poured-in-place (PIP) rubber (soft, rubberized surface) or a combination of PIP rubber and engineered wood fiber (wood chips). These are safer and cleaner options compared to the existing surface. Additionally, the dilapidated benches along the playground’s perimeter will be replaced. The approved budget includes the design, removal of existing playground equipment, and installation of a new playground. The expected construction is Fall of 2024.
Playground Design Options Help decide which playground fun features and slides get added to the design. Take the survey below. The survey will remain open until Monday, April 8th.
Share Playground Survey - Popuch Park on FacebookShare Playground Survey - Popuch Park on TwitterShare Playground Survey - Popuch Park on LinkedinEmail Playground Survey - Popuch Park link
Page last updated: 22 Nov 2024, 02:02 PM
Signup Banner
Project Stage
Plan
Popuch Park Playground has finished this stage
During the planning stage we complete site surveys, feasibility studies, and gather additional information to develop project goals, outcomes and budgets.
Concept Design
Popuch Park Playground has finished this stage
This early stage includes concept development and determination of design options based on the project's goals.
Public Engagement
Popuch Park Playground is currently at this stage
This step aims to inform the public about the project and collect their feedback to help shape the final design. The public might be asked for input on the overall project or specific design concepts.
Final Design
this is an upcoming stage for Popuch Park Playground
This stage includes final design and engineering plans. Once design is complete, we develop technical renderings and construction plan documents.
Construction Ready
this is an upcoming stage for Popuch Park Playground
During this stage requests for bids are issued and contractors are selected. Sometimes projects may wait in this stage until construction funding is secured.
Construction
this is an upcoming stage for Popuch Park Playground
Construction is underway and will follow the construction plan - which may include several phases. During this stage facility and road closures may be needed.
In Use
this is an upcoming stage for Popuch Park Playground
The project is open to the public for use.
Close Out
this is an upcoming stage for Popuch Park Playground
Construction has ended and final reviews are underway.