Popuch Park Playground

Share Popuch Park Playground on Facebook Share Popuch Park Playground on Twitter Share Popuch Park Playground on Linkedin Email Popuch Park Playground link


Popuch Park Playground is one of the oldest playgrounds in the Milwaukee County Parks system, having been installed in 1999. Based on age and condition, this playground is a high priority for playground replacement. Funding for the playground was appropriated in the 2024 adopted capital budget.

The new playground system, would include ADA-accessible features and play structures for both 2-5 and 5–12-year-old children. The playground surfacing will be upgraded from sand to a mixture of poured-in-place (PIP) rubber (soft, rubberized surface) or a combination of PIP rubber and engineered wood fiber (wood chips). These are safer and cleaner options compared to the existing surface. Additionally, the dilapidated benches along the playground’s perimeter will be replaced. The approved budget includes the design, removal of existing playground equipment, and installation of a new playground. The expected construction is Fall of 2024.


Playground Design Options
Help decide which playground fun features and slides get added to the design. Take the survey below. The survey will remain open until Monday, April 8th.


Popuch Park Playground is one of the oldest playgrounds in the Milwaukee County Parks system, having been installed in 1999. Based on age and condition, this playground is a high priority for playground replacement. Funding for the playground was appropriated in the 2024 adopted capital budget.

The new playground system, would include ADA-accessible features and play structures for both 2-5 and 5–12-year-old children. The playground surfacing will be upgraded from sand to a mixture of poured-in-place (PIP) rubber (soft, rubberized surface) or a combination of PIP rubber and engineered wood fiber (wood chips). These are safer and cleaner options compared to the existing surface. Additionally, the dilapidated benches along the playground’s perimeter will be replaced. The approved budget includes the design, removal of existing playground equipment, and installation of a new playground. The expected construction is Fall of 2024.


Playground Design Options
Help decide which playground fun features and slides get added to the design. Take the survey below. The survey will remain open until Monday, April 8th.

  • Share your thoughts on preferred playground fun features and slides by participating in the survey.  

    The survey itself should take less than 10 minutes to complete.  Your feedback and insight will be used to help shape the playground at Popuch Park.  

    Thank you for taking the time to contribute your voice to this project.

    Take Survey
    Share Playground Survey - Popuch Park on Facebook Share Playground Survey - Popuch Park on Twitter Share Playground Survey - Popuch Park on Linkedin Email Playground Survey - Popuch Park link
Page last updated: 22 Nov 2024, 02:02 PM