We use cookies to ensure our site functions properly and to store limited information about your usage. You may give or withdraw consent at any time. To find out more, read our privacy policy and cookie policy.
Manage Cookies
A cookie is information stored on your computer by a website you visit. Cookies often store your settings for a website, such as your preferred language or location. This allows the site to present you with information customized to fit your needs. As per the GDPR law, companies need to get your explicit approval to collect your data. Some of these cookies are ‘strictly necessary’ to provide the basic functions of the website and can not be turned off, while others if present, have the option of being turned off. Learn more about our Privacy and Cookie policies. These can be managed also from our cookie policy page.
Strictly necessary cookies(always on):
Necessary for enabling core functionality. The website cannot function properly without these cookies. This cannot be turned off. e.g. Sign in, Language
Analytics cookies:
Analytical cookies help us to analyse user behaviour, mainly to see if the users are able to find and act on things that they are looking for. They allow us to recognise and count the number of visitors and to see how visitors move around our website when they are using it. Tools used: Google Analytics
Share LED Lighting for Parkways and Pathways on FacebookShare LED Lighting for Parkways and Pathways on TwitterShare LED Lighting for Parkways and Pathways on LinkedinEmail LED Lighting for Parkways and Pathways link
New Lighting
Current Lighting
Project Description
This project will impact eight different parks and parkways in our system.
The impacted locations include:
Milwaukee River Parkway - 50 parkway lights (all lights installed, old lights need to be demoed, and waiting on WE-Energies to turn on)
Kinnickinnic Parkway - 43 parkway lights (all lights installed, old lights need to be demoed, and waiting on WE-Energies to turn on)
Root River Parkway - 74 parkway lights (This project is 100% complete)
Lincoln Creek Parkway – 24 parkway lights (all lights installed, old lights need to be demoed, and waiting on WE-Energies to turn on)
Lincoln Park – 17 pathway lights (waiting on demo of old before turning on the new lights. All lights are installed)
Jackson Park – 13 pathway lights on the southern part of the park outside of the MMSD project scope (all lights installed and operating, demo of existing needs to be performed)
Carver Park – 11 pathway lights (all lights installed and operating, demo of existing needs to be performed)
Beckum Park – 4 parking lot lights, 20 pathway lights (all lights installed and operating, demo of existing needs to be performed)
In total 195 parkway/parking lot lights and 61 pathway lights will be replaced.
New Lighting
Current Lighting
Project Description
This project will impact eight different parks and parkways in our system.
The impacted locations include:
Milwaukee River Parkway - 50 parkway lights (all lights installed, old lights need to be demoed, and waiting on WE-Energies to turn on)
Kinnickinnic Parkway - 43 parkway lights (all lights installed, old lights need to be demoed, and waiting on WE-Energies to turn on)
Root River Parkway - 74 parkway lights (This project is 100% complete)
Lincoln Creek Parkway – 24 parkway lights (all lights installed, old lights need to be demoed, and waiting on WE-Energies to turn on)
Lincoln Park – 17 pathway lights (waiting on demo of old before turning on the new lights. All lights are installed)
Jackson Park – 13 pathway lights on the southern part of the park outside of the MMSD project scope (all lights installed and operating, demo of existing needs to be performed)
Carver Park – 11 pathway lights (all lights installed and operating, demo of existing needs to be performed)
Beckum Park – 4 parking lot lights, 20 pathway lights (all lights installed and operating, demo of existing needs to be performed)
In total 195 parkway/parking lot lights and 61 pathway lights will be replaced.
Share Let us know your thoughts on this project. on FacebookShare Let us know your thoughts on this project. on TwitterShare Let us know your thoughts on this project. on LinkedinEmail Let us know your thoughts on this project. link
Your comments can help shape the future of your parks.