We use cookies to ensure our site functions properly and to store limited information about your usage. You may give or withdraw consent at any time. To find out more, read our privacy policy and cookie policy.
Manage Cookies
A cookie is information stored on your computer by a website you visit. Cookies often store your settings for a website, such as your preferred language or location. This allows the site to present you with information customized to fit your needs. As per the GDPR law, companies need to get your explicit approval to collect your data. Some of these cookies are ‘strictly necessary’ to provide the basic functions of the website and can not be turned off, while others if present, have the option of being turned off. Learn more about our Privacy and Cookie policies. These can be managed also from our cookie policy page.
Strictly necessary cookies(always on):
Necessary for enabling core functionality. The website cannot function properly without these cookies. This cannot be turned off. e.g. Sign in, Language
Analytics cookies:
Analytical cookies help us to analyse user behaviour, mainly to see if the users are able to find and act on things that they are looking for. They allow us to recognise and count the number of visitors and to see how visitors move around our website when they are using it. Tools used: Google Analytics
Share Tippecanoe Park Playground on FacebookShare Tippecanoe Park Playground on TwitterShare Tippecanoe Park Playground on LinkedinEmail Tippecanoe Park Playground link
Update: The playground is installed and ready for use!
Tippecanoe Park Playground was installed in 1997 and a Resolution was approved in 2022 for its replacement; the replacement started being installed on Wednesday, September 27th. Turf restoration may occur in Spring 2024. The new playground system will include ADA-accessible features and the playground surfacing will be upgraded to a mixture of "poured-in-place" surfacing (soft, rubberized surface) and engineered wood fiber (wood chips). This is a safer and cleaner option compared to the existing surface. The approved budget includes the design, removal of existing playground equipment as well as the concrete curb, installation of a new playground, and corresponding site improvements, such as new pathways, benches, and bike racks.
The new playground will include a unique play structure for 2-5-year-old kids, a play structure for 5-12-year-old kids, swings, and a series of play panels laid out to form a maze for 2-5-year-old kids.
MEDIA ALERT: Tippecanoe Park Playground Ribbon Cutting
WHEN: Wednesday, November 1, 2023 at 4:30 pm WHERE: Tippecanoe Park, 1411 E. Warnimont Ave, Milwaukee, WI 53207 WHAT: The Milwaukee County Parks and Supervisor Clancy invite you to the ribbon cutting for Tippecanoe Park's new playground.
Community Engagement
In the Summer of 2023, Parks Engagement staff surveyed parkgoers, neighbors, and members of the Friends of Tippecanoe Park. Based on those results, the playground consultant prepared two designs for the Tippecanoe Park playground. The preferred playground elements were incorporated into the two designs. A second playground survey was distributed via this page for neighbors to choose between the two renderings. Based on the survey results the following playground renderings were selected.
Playground Renderings
Update: The playground is installed and ready for use!
Tippecanoe Park Playground was installed in 1997 and a Resolution was approved in 2022 for its replacement; the replacement started being installed on Wednesday, September 27th. Turf restoration may occur in Spring 2024. The new playground system will include ADA-accessible features and the playground surfacing will be upgraded to a mixture of "poured-in-place" surfacing (soft, rubberized surface) and engineered wood fiber (wood chips). This is a safer and cleaner option compared to the existing surface. The approved budget includes the design, removal of existing playground equipment as well as the concrete curb, installation of a new playground, and corresponding site improvements, such as new pathways, benches, and bike racks.
The new playground will include a unique play structure for 2-5-year-old kids, a play structure for 5-12-year-old kids, swings, and a series of play panels laid out to form a maze for 2-5-year-old kids.
MEDIA ALERT: Tippecanoe Park Playground Ribbon Cutting
WHEN: Wednesday, November 1, 2023 at 4:30 pm WHERE: Tippecanoe Park, 1411 E. Warnimont Ave, Milwaukee, WI 53207 WHAT: The Milwaukee County Parks and Supervisor Clancy invite you to the ribbon cutting for Tippecanoe Park's new playground.
Community Engagement
In the Summer of 2023, Parks Engagement staff surveyed parkgoers, neighbors, and members of the Friends of Tippecanoe Park. Based on those results, the playground consultant prepared two designs for the Tippecanoe Park playground. The preferred playground elements were incorporated into the two designs. A second playground survey was distributed via this page for neighbors to choose between the two renderings. Based on the survey results the following playground renderings were selected.
Your comments can help shape the future of your parks.
You need to be signed in to comment in this Guest Book. Click here to Sign In or Register to get involved
Page last updated: 27 Feb 2024, 11:40 AM
Signup Banner
Project Location
Project Stage
Plan
Tippecanoe Park Playground has finished this stage
During the planning stage we complete site surveys, feasibility studies, and gather additional information to develop project goals, outcomes and budgets.
Envision
Tippecanoe Park Playground has finished this stage
With community input, we develop potential project solutions, identify funding sources and make budget requests.
Design
Tippecanoe Park Playground has finished this stage
The design stage can include several phases, including concepts, iterations, final design and engineering design plans. Once design is complete we develop technical renderings and construction plan documents.
Construction Ready
Tippecanoe Park Playground has finished this stage
During this stage requests for bids are issued and contractors are selected. Sometimes projects may wait in this stage until construction funding is secured.
Construction
Tippecanoe Park Playground has finished this stage
Construction is underway and will follow the construction plan - which may include several phases. During this stage facility and road closures may be needed.
Close Out
Tippecanoe Park Playground has finished this stage
Construction has ended and final reviews are underway.
In Use
Tippecanoe Park Playground is currently at this stage
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends